Bob Kerrey Pedestrian Bridge Underwater Inspection

GBA performed an underwater inspection of all submerged substructure units on the Bob Kerrey Pedestrian Bridge over the Missouri River in Omaha, Nebraska.

  • Level I and Level II underwater inspections were performed with a minimum of 10% Level II inspection.
  • Acoustic imaging was performed on all submerged substructure units where the water depth was greater than 10 ft.
  • A bathymetric channel scan was performed from approximately 300 feet upstream to 300 feet downstream with channel soundings along profiles at 100 feet upstream, centerline, and 100 feet downstream of the bridge.

The final report included repair recommendations, substructure condition ratings, and notes, channel sounding plan and profile, bathymetric channel scan plan view, and inspection photos.

PROJECT DETAILS
Client
City of Omaha, Nebraska

SIMILAR PROJECTS:
Contact Us
Let’s Create Something Remarkable Together
We will bring the complete team to meet your needs and move your project forward. Contact GBA today.
Reach Out
Dedicated In-House Affiliates
The power of collaboration
GBA’s team of affiliate companies brings together a powerful combination of expertise and services to streamline your project’s success.
MEET OUR AFFILIATES