< Back to all projects

orbital in the Telecommunication room

Mission Critical Internal Expansion

Posted on Posted in Project
GBA provided all architectural and engineering design associated with the preparation of construction documents for this mission critical internal expansion, which involved converting 5,000 square feet of shell space into telecommunication and data center power equipment-ready space. A new electrical service, standby diesel generator and air-cooled chillers were added to support the new equipment. Additionally, office areas were converted into Read More>

Mission Critical HVAC Upgrade

Posted on Posted in Project
GBA provided a mission-critical HVAC upgrade for a nationwide telecommunications provider. The data center facility was built in the late 1980s and the HVAC equipment was at end-of-life. The water-cooled chillers, cooling towers, pumps and leaking air-handling units resulted in excessive energy and water usage and poor reliability. Also, the operation of this facility was dependent on the availability of Read More>
Fire control panel in a large data center.

Mission Critical Fire Alarm Upgrades

Posted on Posted in Project
GBA’s Mission Critical Group was selected by a national telecommunications provider to visit multiple sites and audit existing data center fire alarm and suppression systems. The primary focus of these audits was on end-of-life alarm systems that are considered obsolete and no longer supported by the manufacturer. Repair or replacement parts for these systems are no longer available which could Read More>